This entire house was built and expanded using non-pressure-treated girder material. The engineer commented that he's never seen something so dangerous. The crew shored and leveled various home sections and replaced all girders, totaling over 900 ft. Several dozen joists, new sills, 48 helical piles (by handheld machine), and all new piers were added. This house is now level, secure, and floodproof.