Double Home Elevation

This home required exterior property line shoring, foundation removal, and double lifting. On the right side, there are two feet of property, and on the left 4ft., with active construction. The team carefully navigated the surroundings and performed a fantastic overall project. These projects are not without struggle, but the project management and field crews communicate every step of the way, ensuring the best outcome.

Before Images
During Images
After Images
Prior to beginning the Manasquan project, the Hale Built Group team was faced with several challenges, including limited space for property line shoring and the removal of the foundation for the double lifting process. Additionally, the site presented difficult soil conditions that required innovative foundation solutions to ensure stability and safety. To address these challenges, the team utilized their expertise and innovative techniques to create a plan for a successful project.
The Hale Built team used a variety of techniques to overcome the challenges posed by the limited space and active construction on the Manasquan project. Customized shoring system: To ensure the stability of the property line during the double lift, a custom shoring system was designed and installed by the team. This system incorporated steel beams, timber lagging, and a soldier pile wall to provide optimal support while minimizing disruption to the surrounding area. Precision excavation: Due to the limited space available, excavation had to be done with extreme precision. Hale Built Group utilized specialized equipment and techniques to excavate the foundation, carefully removing debris to avoid damage to surrounding structures and utilities. Double lift operation: The double lift of the structure was a complex operation, requiring precise coordination between the team members. The team utilized hydraulic jacks and a custom-designed rigging system to lift the structure and support it during the process.
Successful completion of the project: Despite the many challenges posed by the limited space and active construction, the Hale Built Group team was able to complete the double lift project safely and efficiently, with minimal disruption to the surrounding area. Enhanced structural integrity: The custom shoring system and precision excavation ensured a stable foundation for the structure, providing long-lasting support and reducing the risk of future structural issues. Community-friendly construction: The successful completion of the project with minimal disruption to the surrounding residencies or adjacent ongoing construction resulted in a more positive relationship between the our team and the local construction company and community.
Get an Estimate!
Estimate
Join our Team
Apply Online
New Jersey License Numbers:
HEC# 13HE00001990
HIC# 13VH08115000
Founded by veterans, the Hale family of companies has been a leading foundation repair company in New Jersey since 1946. We pride ourselves on maintaining a family-oriented company that hires local crew members and former service members. 

Each project has intricacies that deserve individual attention. We never employ salespeople. You’ll meet with a professional with a distinct understanding of solving complex problems and providing solutions within your budget. We come to your project to solve it, not to sell you what you don’t need. 

We're reliable partners for every foundation repair, home elevation, waterproofing, and deep foundation project you undertake throughout New Jersey and the mid-Atlantic.
This is a block of text. Double-click this text to edit it.