In Brick, NJ, a coastal replica home faced foundation failure due to repeated tidal flooding and deteriorated timber piles. Our team engineered and installed a Magnum Moment Frame supported by a reinforced concrete grade beam and supplemental helical piles. This permanent solution restored stability while protecting the home against future tidal impacts.
