High-Elevation Double Lift & Foundation

We executed a precision 20-foot double lift and installed 36 helical piers to support a new first-story addition, ensuring maximum load capacity and structural stability.

The home sat at a low elevation on a foundation that lacked the structural capacity to support a new first-story addition or withstand modern coastal loading requirements.

Talk to an Expert

We executed a complex double-lift sequence, elevating the home 20 feet above grade to install 36 helical piers at depths of 19 feet, creating a high-capacity structural base.

Get a FREE Estimate

The home was precisely lowered onto its reinforced foundation, achieving long-term stability and an expanded living space.